Collective Orders
A collective order is a logistical linkage of planned orders, production orders, or process orders across multiple manufacturing levels Collective orders represent multilevel production structures for materials produced in-house in which the manufacturing order for the highest material in the structure automatically generates manufacturing orders for the semifinished products in the structure. The output quantity of the manufacturing orders for the semifinished products is the quantity required
phantom assembly
A simple to understand definition for phantom assembly Our "rule of thumb" is that if we do not hold stocks of a material, it is created with special procurement key 50 (= Phantom assembly). e.g. in our business we manufacture petfood. the actual food in the can is made up of gravy and meat. The meat is stocked so is a non-phantom, but the gravy is made up of powders and liquids which we mix together then add the meat into it. In this case the gravy is a phantom material (with a BOM) a
MRP-Areas describe
MRP-Areas are needed only if a material in the same plant need more than one type of planning parameters, or need more than one type of ATP logic (viz. SLoc specific). Having logical MRP-Areas based on material type, or based on any un-necessary requirement, should be avoided, because Plant cannot create demand on MRP-Area and one MRP-Area also cannot create demand on another MRP-Area.Demand can be transferred from plant to MRP area via Special procurement type 45[@more@]
Trigger Point in rework
First create a reference op set ( ca11)then create a trigger point( Ex fert)( co31)Go to ops , choose operation(20) go to trigger point in edit menu and choosetrigger point.Include your created trigger point(fert) and tick in boxNow choose that line and goto menu trigger point overview andtick the function create order with referenceenter the status as pcnf for op 20 ,activate once and + signplace the cursor on create order with reference line and go to parametersand enter the reference op set g
How to create a fiscal year
经过几天的努力,今天终于给前几天遇到的问题(Version 0 is not defined for fiscal year 2007.)解决,几分欣慰.具体方法:Tools ® AcceleratedSAP ® Customizing ® Edit Project ® SAP Reference IMG ® Controlling ® Cost Center Accounting ® Planning ® Basic Settings for planning.[@more@]