ITPub博客

首页 > 应用开发 > IT综合 > phantom assembly

phantom assembly

原创 IT综合 作者:ciolmy 时间:2007-04-27 11:07:33 0 删除 编辑
A simple to understand definition for phantom assembly


Our "rule of thumb" is that if we do not hold stocks of a material, it is
created with special procurement key 50 (= Phantom assembly).

e.g. in our business we manufacture petfood. the actual food in the can is
made up of gravy and meat. The meat is stocked so is a non-phantom, but
the gravy is made up of powders and liquids which we mix together then add
the meat into it. In this case the gravy is a phantom material (with a
BOM) as we do not stock it. It is an 'in-line' product. i.e. it is
produced and immediately used to produce something else.
[@more@]

来自 “ ITPUB博客 ” ,链接:https://blog.itpub.net/744907/viewspace-912584/ ,如需转载,请注明出处,否则将追究法律责任。

上一篇: MRP-Areas describe
下一篇: Collective Orders
请登录后发表评论 登录
全部评论
  • 博文量
    13
  • 访问量
    95864