Purpose
for total planning, particularly for MRP, we know we can use "sequence of plant" to define the sequenced plant list for planning run, for example in MD01/MD40(MPS);
and we can also use "Product group" to group the materials which will have planning run at one time together, like in MD02/MD41 (MPS) multiple level
However, there is drawback here: let's say if we have some material, some special materials, which belong to the Sequence of plant, we need to exclude it or include, how to achieve.
content:
here is one approach to accomplish the purpose abovmentioned - we use "user-exit" in total MRP MD01.
you can see that under 5395, all codes with WP9 MRP controller as below:
And you can see, 2 codes with the same PD MRP type, and WP9 MRP controller.
Now, let’s simulate run the MRP job :
Or for MPS total planning, it is the same:
Customizing place:
Regarding to the exact user-exit
For example:
For example
So, let's summarize its usage and trait :