Purpose:
we need to monitor the "lot size" influence in planning run from PDS.
Content:
R3:
APO
Now
No LSK maintained in product master
Run Heu.
==> 正确地选择PV 1
If the F/C is more than 99
Run Heu.
check一下
Fix 21天。。。所以08/14的requirement date,需要从07/24开始。因为:
如果将F/C改为08/24
则run Heu.
==> 正确地选择PV 2
测试下product master下的Lot-size
Fix lot size:
Minimum lot-size
Rounding value
==> 居然no order 产生: 这是因为rounding value为200,而我们lot-size是只到199.。。
修改rounding value