首页 > 应用开发 > IT综合 > How To Run MSRFWOR - Refresh Collections Snapshots Concurrent Request From The Application
In this DocumentGoal
Solution
References
Oracle Advanced Supply Chain Planning - Version: 11.5.2 to 12.0
Information in this document applies to any platform.
EXECUTABLE:MSRFWOR - Refresh Collection Snapshots
The Refresh Collection Snapshots can be run as a standalone concurrent request using the following steps
This is recommended as a first step when launching Data Collections for the first time on a new or cloned instance.
The request is available under the Material Planner responsibility.
OR in 11.5.10 and above in Advanced Supply Chain Planner.
OR using System Administrator, it can be added to the Request Group OM Concurrent Programs
so that it is visible when for ATP Data Collections from Order Management
For Distributed installations with separate ERP and APS instances, this is ALWAYS run on the ERP Source Instance
NAV: Material Planner (or ASCP) / View / Requests / Submit a new Request
Parameters:
1. Refresh Method - Fast / Complete / Automatic
Fast Refresh will only process changes since the last run of the Refresh Snapshots or Data Collections.
Complete Refresh will process all the snapshots and completely refresh the snapshot(s).
Automatic Refresh will truncate the snapshot log and then run a complete refresh of the snapshot(s).
Note: Automatic Refresh does NOT check the profile MSC: Source Setup Required, so if running for the first time after a patch or in an newly cloned instance, then use Complete Refresh
Note: When running Data Collections request set, Refresh Snapshots always uses a Fast Refresh for performance reasons. This is usually not a problem, unless the snapshot logs have grown very large. Then corrective steps are required.
2. Snapshot Name - Use the Default 'All Snapshots' or choose a snapshot from the list
3. Threshold for Truncating Logs - Used only in Automatic Refresh.
Enter the number of lines to check for in the MLOG$ table.
For example, a value of 50 will truncate the log if 50 or more lines are in the MLOG$ snapshot log table and then perform a complete refresh of the snapshot.
Use 0 when running this to help resolve performance issues.
4. Degree - Refers to the degree of Parallelism to be used by the database to process the request.
Maximum value is 10. The higher the degree of parallelism, the faster the process will complete.
Note: Entering a number higher than 10 will result in the use of 10 for this value.
Also see Note 207644.1 Data Collections Fails - First Steps to understand the Setup Requests that are run by the Refresh Snapshots concurrent program when MSC: Source Setup required = Y
For Performance or Errors with Refresh Snapshots standalone or as part of the Data Collection request set
List of Snapshots
The following SQL will reveal the list of snapshots that are available in the release on the system. This list changes with each release or may change depending on the level of code in the release.
SELECT flex_value "Snapshot Names"
FROM fnd_flex_values
WHERE flex_value_set_id = 1011785 and
flex_value not in 'ALL SNAPSHOTS'11.5.10 listing as an example:
Snapshot Names
PO_ACCEPTANCES_SN
PO_CHANGE_REQUESTS_SN
WIP_WOPR_RESS_SN
AHL_SCH_MTLS_SN
BOM_SUB_COMPS_SN
MTL_RESERVATIONS_SN
BOM_BOMS_SN
BOM_CTO_ORDER_DMD_SN
BOM_INV_COMPS_SN
BOM_OPR_NETWORKS_SN
BOM_OPR_RESS_SN
BOM_OPR_RTNS_SN
BOM_OPR_SEQS_SN
BOM_RES_CHNGS_SN
BOM_SUB_OPR_RESS_SN
MRP_FORECAST_DATES_SN
MRP_FORECAST_DSGN_SN
MRP_FORECAST_ITEMS_SN
MRP_SCHD_DATES_SN
MTL_DEMAND_SN
MTL_MTRX_TMP_SN
MTL_OH_QTYS_SN
MTL_SUPPLY_SN
MTL_SYS_ITEMS_SN
MTL_U_DEMAND_SN
MTL_U_SUPPLY_SN
OE_ODR_LINES_SN
PO_SI_CAPA_SN
WIP_DSCR_JOBS_SN
WIP_FLOW_SCHDS_SN
WIP_REPT_ITEMS_SN
WIP_REPT_SCHDS_SN
WIP_WLINES_SN
WIP_WOPRS_SN
WIP_WREQ_OPRS_SN
Note 207644.1 - Data Collections is Failing - All Errors - First Diagnostic StepsNote 209571.1 - MLOG ManagementNote 220115.1 - Managing MSCD and MSCX Tablespaces for APS Implementations - (Data Collections Sizing)Note 223026.1 - List of High Priority Patches for the Advanced Planning & Scheduling SuiteNote 266797.1 - Rollback Segment Assignment and Automatic Undo Management Mode for MRP and APS Applications ORA-01562 ORA-01555
ORA-12008 error in materialized view refresh pathORA-1655 unable to extend cluster
来自 “ ITPUB博客 ” ,链接:https://blog.itpub.net/729410/viewspace-906590/ ,如需转载,请注明出处,否则将追究法律责任。