Construction technology is used in concrete mixing station

原创 Oracle 作者:muddydai 时间:2015-05-06 17:43:45 0 删除 编辑

1, concrete mixing station installation portable cement mixer, by qualified personnel according to the factory specification,and organization under the auspices of debugging in the technical staff, in the technical performance indicators are in conformity with the provisions and after acceptance, can be put in touse.

Henan Daswell Machinery Co., Ltd,is a professional manufacturer and trader specializing in the research, development and production of construction machinery for nearly 30 years. Our main products are as follows:MP1000 Planetary Concrete Mixer equipment,Ready-Mixed Concrete Making Plant,batch plant for sale,etc. We will provide you with the best product and service.


2, before the operation check the project shall meet the following requirements:

(1) the stirring transmission, cylinder and the supporting mechanism of moving parts and cabin door, Doumen belt type concrete batching plant, there were no foreign body stuck in orbit;

(2) the lubricating oil tank oil level in accordance with the provisions;

(3) too much water in the open water separator valve exhaust gas system, open air storage tank drain plug out of oil and water mixture;

(4) rope pull shovel bucket or installation, the reel winding steel wire rope and pulleys are correct,in line with the provisions of the hopper, and the sensitive and effective brake pull shovel;

(5) the bolts. The inlet and the discharge valve, no limit to wear, the conveyor belt tension is appropriate, without deviation;

(6) weighing device all the control and display part is working properly concrete block making machine, in accordance with the provisions of its accuracy;

(7) the electrical device can effectively control the mechanical action, the point of contact and the movable contact and the static contact without obvious damage.

3, according to the mixing station for qualified technical performance of sand and stone aggregate size exceeds the range of permission shall not be used.

The 4 part, the unit should gradually start. After the start of the functioning of the various components and the instrument indication should be normal, oil and gas pressure should be consistent with the requirements, we can begin to work.

5, in the work process, in the material storage area and elevator bucket, prohibited personnel to enter.

 