The basic working principle of existing concrete mixing equipment: aggregate by batching machine measurement, the belt transport to the bucket, the bucket will aggregate into the blender; powder material transported to the powder material measuring hopper through the screw machine, the powder material measuring hopper put into the mixing machine; the water from the water metering hopper after the measurement, measuring admixture on water metering hopper, the mixed liquid by excessive bucket and pipeline put into the Mixer Blender; through a hopper will be basically completed concrete mixing into concrete transport vehicle.
Henan Daswell Machinery Co., Ltd,is a professional manufacturer and trader specializing in the research, development and production of construction machinery for nearly 30 years. Our main products are as follows:planetary concrete mixer supplier,concrete batching plants,concrete block making machine,etc. We will provide you with the best product and service.
In order to facilitate the understanding of the process mini mix concrete batching plant, we make the action classification: all the raw materials to the host before the transportation time is called the preparation time; put all the ingredients into the host of the time called the feeding time; the time of stirring material called stirring; mixing the concrete to complete on time some transport car called the discharge time, the transport vehicle alternate splice required time called the vehicle ready time
The existence of the bucket's aim is to ensure that all materials can be prepared in time before the start of feeding, namely the preparation time is less than the mixing time and the discharging time. If meet at the same time can ensure the vehicle in front of the inequality of preparation time than the stirring time and discharge time, continuous production diesel engine concrete mixer, mixing time can be achieved as follows:preparation time (the first cycle material) - feeding time, stirring time and discharging time, feeding time, stirring time and discharging time......
Only achieve this cycle, to achieve continuous production of true to equipment. Because the preparation time only after initial production will be credited to the continuous production equipment, production efficiency.