439.Which DBMS_SCHEDULER procedures can be used to enable a program? (Choose all that apply.)
A. ENABLE
B. ENABLE_PROGRAM
C. VALIDATE_PROGRAM
D. SET_ATTRIBUTE
E. SET_ENABLED
Answer: AD
哪些DDBMS_SCHEDULER过程可以用来启用程序?
Programs (as well as jobs) can be enabled in two ways: by using the ENABLE procedure or by using the SET_ATTRIBUTE procedure to set the ENABLED attribute to TRUE.
程序(以及作业)可以启用在两个方面:通过使用ENABLE过程或使用SET_ATTRIBUTE过程来设置enabled属性为TRUE。
来自 “ ITPUB博客 ” ,链接:https://blog.itpub.net/81227/viewspace-2124107/
,如需转载,请注明出处,否则将追究法律责任。