ITPub博客

首页 > 数据库 > Oracle > 1Z0-053 V13.02 Q645

1Z0-053 V13.02 Q645

原创 Oracle 作者:cow977 时间:2016-06-16 20:43:50 0 删除 编辑
645.Which two statements are true about a job chain? (Choose two.)
A. A job chain can contain a nested chain of jobs.
B. The jobs in a job chain cannot have more than one dependency.
C. A job of the CHAIN type can be run using event-based or time-based schedules.
D. The jobs in a job chain can be executed only by using the events generated by the Scheduler
Answer: AC

参考:http://docs.oracle.com/cd/E11882_01/appdev.112/e40758/d_sched.htm#ARPLS72960

Defining Chain Steps
After creating a chain object, you define one or more chain steps. Each step can point to one of the following:
A Scheduler program object (program)
Another chain (a nested chain)
An event schedule, inline event, or file watcher
You define a step that points to a program or nested chain by using the DEFINE_CHAIN_STEP procedure. An example is the following, which adds two steps tomy_chain1:
BEGIN
DBMS_SCHEDULER.DEFINE_CHAIN_STEP (chain_name => 'my_chain1',step_name => 'my_step1',program_name => 'my_program1');
DBMS_SCHEDULER.DEFINE_CHAIN_STEP (chain_name => 'my_chain1',step_name => 'my_step2',program_name => 'my_chain2');
END;
/

来自 “ ITPUB博客 ” ,链接:https://blog.itpub.net/81227/viewspace-2120301/ ,如需转载,请注明出处,否则将追究法律责任。

上一篇: 1Z0-053 V13.02 Q638
下一篇: 1Z0-053 V13.02 Q10
请登录后发表评论 登录
全部评论

注册时间:2011-03-02

  • 博文量
    698
  • 访问量
    893915