Process order: M35040
The TR document 271120 for this process order,
LT04 to convert TR to TO,
Save it. Batch determination was conducted. Once TO was confirmed,
the batch of components was updated into process order,
Now business team wants to change the batch number of the first raw material RR0078, from batch number 2000683285 to 2000683286, how to handle?
COR2 to reset the requirement quantity as 0 for this material/batch,
And set the quantity in the mirror line of this material,
Save it.
A new TR was created automatically for this material,
New TR number is 271121,
LT04 to create TO reference to this TR, specify batch number 2000683286 by manually when create TO,
Save it and confirm the TO document.
The new batch number was updated into process order automatically,
By the way, We need to move the stock of original batch for that material from PSA back to warehouse.
2017-02-09 写于苏州市吴中区
来自 “ ITPUB博客 ” ,链接:https://blog.itpub.net/29829936/viewspace-2133292/ ,如需转载,请注明出处,否则将追究法律责任。