ITPub博客

首页 > 数字化转型 > ERP > SAP MM ME51N 创建采购申请单据时候永远取物料主数据基本计量单位

SAP MM ME51N 创建采购申请单据时候永远取物料主数据基本计量单位

原创 ERP 作者:DicksonJYL560101 时间:2015-07-24 14:27:34 0 删除 编辑

SAP MM ME51N 创建采购申请单据时候,采购申请单据的计量单位永远取物料主数据基本计量单位

 

1>MM03 to see the Base UoM and other UoM for material,

 

 

2>ME51N to create a PR document, input material code, plant, qty etc,

 

The UoM is KG (base UoM), cannot be changed!

 

3>ME51N to create PR document, we input UoM PC first,

Then we input material code, qty, plant,

 

We click ‘Enter’ key,

 

The UoM was changed into KG automatically!

Why?

 

We got below information to explain this phenomenon.

 

Symptom

You are using transaction ME51 or ME51N to create a purchase requisition (PRreq). For an item with a material number, the base unit of measure (UoM) is always transferred to the UoM field of the item (EBAN-MEINS), even if an order unit for the affected material is maintained in the material master.
This also applies to transaction ME25, which technically runs the same programs.

 

Reason and Prerequisites

The system is programmed this way (this is not an error); the base UoM field from the material master (in MT06E-MEINS) is transferred to EBAN-MEINS.

 

Solution

There are none. This function is not provided and is also not included in later Releases.

 

 

Micro Message: JINYULIN_SH_

来自 “ ITPUB博客 ” ,链接:https://blog.itpub.net/29829936/viewspace-1749599/ ,如需转载,请注明出处,否则将追究法律责任。

请登录后发表评论 登录
全部评论
行万里路,读万卷书,阅无数人。 吃货一枚,爱吃湘菜,粤菜与杭帮菜,尝遍天下美食。 摄影爱好者,游遍名川大山,江河胡海,赏遍人间春色。 爱看电影,尤其是国产大片,好莱坞大片。英文名:Dickson Jin, 网名:风一样的BOY。精通SAP供应链咨询。2017年开始研习人工智能。

注册时间:2014-08-27

  • 博文量
    2598
  • 访问量
    4674838