【Planning】MRP planning exit to exclude codes
Purposefor total planning, particularly for MRP, we know we can use "sequence of plant" to define the sequenced plant list for planning run, for example in MD01;and we can also use "Product group" to group the materials which will have planning run at one time together, like in MD02/MD41 (MPS).Ho...
[Planning] PIR - Adjustment period
Purpose:在planned independent requirement的处理中,adjust与reorg起到很大的作用;adjust类似于consumption并不会真正地去deduct掉PIR,而reorg则会处理掉PIR;Ajust period类似于forecast horizon。Reorg,若要完整地清除PIR hisotry,可以采取三步走的策略。Content:Adjust它定义在...
【Planning】PI - 关于多个operation的lead time scheduling
Purpose不同于discrete manufacturing,不同的operation要么linear要么overlapping地进行process, 所以lead time scheduling是总和;而在process/flow manufacturing中,Lead time总是采取longest lead time;这一点,在production order的routing中关于overlapping中也可以进行设置如参考flow manufacturing....
【Planning】MTO - strategy 50
Purpose在MTO中,20的strategy代表着pure MTO,较为简单,planning完全根据SO来run,产生SO specific的PL order或replenishment;而50相对要复杂一些,那可以使用PIR来提前run降低一些component或assemblies的Lead tme,类似于MTS(特别是40, planning with final assembly),但是与MTS又有本质的不同。它...
【Planning】MTS - Planing strategy, as well as consumption, reduction, withdraw
Purpose实例表明MTS的planning strategy,10/30/40/70, 以及发生的consumption, reduction, withdraw;Process:首先这个料维护了MRP Group而该Group分配了strategy group为40.所以,这也是为什么默认MD61都是VSF。 如果清空MRP Group与MRP 3下面的s...
【Planning】Functional and Techncial of Capaciy - Interval, shift
Objective This solution proposal is based on “Interval” extraction inECC. As we know, if we can get “interval” correctly for the resource capacity,we can achieve: 1). to know why the ETA is calculated to that date/time 2). To cut the “interval”, then we can qui...
【Planning】MTO - Super BOM
PurposeClassification is widely used in SAP, like 001- material, 023-match, 300-VC etc. This one-not is to record the process how to fulfill the various customized requirement from various customer, like MTO, like PC industry.And here only shows the BOM related, Super BOM and OD.Pr...
【Planning】R3 PTF and firm mapped with APO
Purpose: 理清R3里的firm type,与APO里的SNP production horizon、ST horizon等的关系。 Approach: MRPType P1 - > Change to X0 in ECC - > Via CIF Enhancement , map thePlanning time fence ( from ECC) to SNP Prod Horizon/ SNP Stock transfer horizon( de...
[WD] WebDynpro for ABAP 案例集 - Edison_tc 完结V1.2
本系列主要讲述WD4A中的各种案例,详细叙述在WD4A中的问题以及解决方案。可以作为一个参考文档,供WD4A的开发。 相较于V1.1(http://space.itpub.net/17144169/viewspace-675557 )新添加了近10个案例,是最近在实际项目中所遇到的问题以及解决方案。以下是V1.2目 录。-----------------------------------------...