A. A job chain can contain a nested chain of jobs.
B. The jobs in a job chain cannot have more than one dependency.
C. A job of the CHAIN type can be run using event-based or time-based schedules.
D. The jobs in a job chain can be executed only by using the events generated by the Scheduler
答案:(A、C)
来自 “ ITPUB博客 ” ,链接:https://blog.itpub.net/17013648/viewspace-1332039/ ,如需转载,请注明出处,否则将追究法律责任。