ITPub博客

首页 > 数据库 > Oracle > Oracle 11G OCP 1Z0-052 113

Oracle 11G OCP 1Z0-052 113

原创 Oracle 作者:LuiseDalian 时间:2014-06-24 07:46:11 0 删除 编辑
(113)You are working on a new Oracle Database 11g server, where only the software is installed and no database is created.

You plan to create a database on this server using the Database Configuration Assistant (DBCA).

Some of the requirements set for your database creation task are:

1: Configure the database to operate in shared server mode.

2: Disable automatic maintenance tasks such as optimizer statistics collection.

3: Configure a naming method to help the remote user connect to the database instance.

4: Use Automatic Storage Management (ASM) for storing the database files.

5: Configure daily database backup to flash recovery area.

6: Configure Enterprise Manager Database Control to manage the database.

Which of these requirements can be met while creating the database?

A.  4 and 6

B.  2, 3, 4, and 6

C.  1, 2, 4, 5, and 6

D.  1, 2, 3, 4, 5, and 6

答案:(C)

解析:

3属于网络配置,是通过netca来完成的

来自 “ ITPUB博客 ” ,链接:https://blog.itpub.net/17013648/viewspace-1192214/ ,如需转载,请注明出处,否则将追究法律责任。

请登录后发表评论 登录
全部评论

注册时间:2012-02-06

  • 博文量
    1986
  • 访问量
    6046368