首页 > 数字化转型 > ERP > SCM605--Data Flow
1.Understanding Document Flow and Completion Status
*if you want to restrict the reference to an item (for example, only until the full quantity in the preceding document has been referenced), set the appropriate Completion rule in the item category. The status of each item in the preceding document is updated separately, depending on the completion rule of the item category.
2.Copy Control
*To control the copying procedure, at each level you create:
.Data transfer routines
These routines control how fields are copied from the reference document.
.Copying requirements
Here you define requirements that are checked when you create a document with reference. If these requirements are not met in a particular case, the system issues a warning or error message and if necessary,terminates processing.
.Indicators
There are switches for setting specific controls for each transaction. For example, you can activate or deactivate the transfer of item numbers from the preceding document at the header level for sales documents.
来自 “ ITPUB博客 ” ,链接:https://blog.itpub.net/149809/viewspace-1026475/ ,如需转载,请注明出处,否则将追究法律责任。