Product cost variance calculation: no standard cost estimation

原创 Linux操作系统 作者:canc3r 时间:2011-10-26 00:16:56 0 删除 编辑
 You are using a function that calculates the target costs in the current
 standard cost estimate for the material. Using this information, the
 system can calculate the following data:

 o   Work in process (WIP) for the confirmed WIP quantities

 o   Scrap for the confirmed scrap quantities

 o   Variances between the target costs and the control costs

 However, the cost estimate for material MXMC-001 in plant 6000 is:

 o   Missing

 o   Not released

 o   Not valid on 2011.10.25

 o   Not saved as an itemization

 o   Not valid at the time WIP or variances were calculated

 o   Not saved in the controlling area currency
     This can be the case when the controlling area currency is not the
     same as the company code currency. Since variances are always
     calculated in the controlling area currency, the cost estimate must
     be saved in controlling area currency (refer to "Procedure").