• 博客访问: 256641
  • 博文数量: 130
  • 用 户 组: 普通用户
  • 注册时间: 1970-01-01 08:00
个人简介

专注SAP ERP FICO实施应用 联系方式 zzzjeff@163.com

ITPUB论坛APP

ITPUB论坛APP



APP发帖 享双倍积分

文章分类

全部博文(130)

微信关注

IT168企业级官微



微信号:IT168qiye



系统架构师大会



微信号:SACC2013

订阅
热词专题

分类: IT综合技术

Answer: The following priority sequence applies to the determination of the quantity structure.
Priority 1:If you assign a quantity structure on the initial screen of the cost estimate, the system uses it in any case.

Priority 2:The system determines the quantity structure data that you have entered in the cost estimate view of the material.

Priority 3:Via the selection method indicator in Materials Planning view 4 in the material master, you can control whether the quantity structure occurs according to validity (lot size, period) or according to production version.

Priority 4:The quantity structure is determined via the settings in the quantity structure control (Transaction OKK5).

[@more@]
阅读(1238) | 评论(0) | 转发(0) |
给主人留下些什么吧!~~
评论热议
请登录后评论。

登录 注册