PM Daily - 20180603

原创 IT综合 作者:YoungEric 时间:2018-06-03 21:29:11 0 删除 编辑
1. EPM: Enterprises Project Management 
2. Manhattan Project applied project management and systems engineering ideas and solutions.
3. In 1917, Henrry L. Ganntt proposed the famous Gantt chart.
4.  CPM: Critical Path Method
    In 1957,Du Pont applied CPM to equipment maintenance,reducing maintenance downtime from 125 hours to 7 hours.
5. PERT: Program/Project Evaluation and Review Technique 
   PERT originated in 1958 with the Polaris missile design and construction scheduling. The method to model  the relationship of project tasks reduced the original estimated time for the development of the Polaris missile by two years.
6. PMI: Project Management Institute
    PMBOK: Project Management Body Of Knowledge
    PMP: Project Management Professional
7. PMP
    IPMP
    CPMP

8. https://www.pmi.org/
    http://www.ipmp.net.cn/

    http://www.mypm.net/ 
    http://www.project.net.cn/ 

来自 “ ITPUB博客 ” ,链接:http://blog.itpub.net/10484922/viewspace-2155559/,如需转载,请注明出处,否则将追究法律责任。

上一篇: 老毛病犯了
下一篇: 没有了~
请登录后发表评论 登录
全部评论

注册时间:2007-12-18

  • 博文量
    79
  • 访问量
    211246